Hi, welcome to visit !

  1. home
  2. the mining of concrete and raw materials 2

the mining of concrete and raw materials 2

Finally, besides the energy needed for the raw materials production, at the concrete plant electricity and fuel are required for mixing all the components. The energy consumption for the operations at a ready-mix concrete plant has been estimated to be 4% of the embodied energy of concrete ( Marceau et al., 2007 ).

Get a QuoteOnline Message